Thursday, April 18, 2013

Bamboo Installation Instructions for Those Considering Similar



When designing my new lab, I wanted to make a grand interior statement that would also delineate the entry area from the rest of the open upstairs. For economy purposes, the majority of the upstairs ceiling is drywall, so what does that leave as an alternative? Well, wood for one. I looked at pine T&G planks, the old standby. After spending hours picking through the boards at the local box store, and paying almost $1 per linear foot, and hauling it all home, I realized that even with the warmest finish I could find, the ceiling would still exude a cabin feel. Not the vibe I was going for. But not only that, there’d still be the knots, voids, and sap-weeping to deal with, and then the cost and time of finishing 200+ sq ft of the stuff. No, there must be something better. I looked at “prefinished tongue and groove planks” which turned out to be a composite of chip board and glue wrapped in a woodgrain decal. Umm, no. What else?

Pre-Work:
So I started doing some research about installing flooring on the ceiling. Answers were few and far between. Examples exist of people doing this, but tech forums are split on the subject. Apparently the idea is too much to handle for some. What I eventually deduced was that floating floors are out, for obvious reasons. Composite and laminate floors are made of layers that expand/contract at different rates and even though some are rated for a nail-down application, I wanted a homogenous material to avoid as much risk as possible; if a plank comes loose on the floor, fine. If it comes loose on your ceiling, now we have a problem. Same goes for “engineered floors” which are a veneer over a substrate material.

I had a look at the floor section at Menards and found some tongue and groove Honey Bamboo flooring that looked very appealing. Best of all it was pre-finished and on sale. Compared to pre-finished solid wood, it was a bargain at  under $3 sq/ft.

Now, I had two new problems…1) How to attach the planks. And…2) My joists are 24” OC while the planks are 37-3/4 long.

In reality, if I had 16” OC joist spacing and had confidence that the joists were perfectly straight (such as TJI’s), it would have been possible to attach the bamboo directly to the joists. This would have worked great in a basement. However, I wasn’t comfortable with the joint spacing, my joists were traditional 2x10’s so I couldn’t guarantee flatness, and this ceiling is also the underside of the insulated and vented roof (flat roof), so I had some concerns about where my dew point would form.

The solution? I decided to install 7/16” OSB over my joists as a base. This would help seal out potential dust and drafts that might work through the joints, provide a solid face to accept glue, create a thermal break, and allow shimming and adjustment between the OSB and planks if things got really bad. I attached the OSB using small square-drive trim screws of sufficient length to penetrate well into the joists, making sure the heads sat flush (or slightly recessed) with the OSB. Any panel joints that didn’t fall over a joist received blocking to keep the edges flat. I could have used sheetrock but I planned on both gluing and pinning the planks with my brad nailer and in my experience,  sheetrock would never hold the brads. Ultimately, straightness and flatness were the goal.

How to Attach:
The last thing I want to do is have these planks loosen up and break free years from now. Granted, they’re T&G which provides some assurance, but ultimately a failure of consecutive rows would result in a real mess. So…glue and brads. Using glue ensures the majority of plank area forms at least some kind of bond with the OSB it makes contact with; imperfect voids are filled. The brads do 2 things- they keep the plank in place until the glue sets, and they provide backup in case the glue fails someday.

So what glue? I ran a test with three of the most likely candidates I could find- Liquid Nails-Heavy Duty, Loctite PowerGrab All-Purpose, and Loctite PowerGrab Molding. All promised “instant grab” and were designed for attaching wood to most anything. All came in caulk tubes. The test consisted of gluing plank samples to a strip of OSB screwed to the ceiling and evaluating for various properties, both initially and after 24 hours. I won’t go into all the details, but Liquid Nails won out for quickest initial setting, strongest breakaway bond, lowest cost and it’s available in the large size caulk tubes. This is what I proceeded with for the project.

Layout:
First thing you’ll want to do is acclimate your material to the surrounding environment; I staged my bamboo for a couple weeks in advance. Meanwhile, consider your layout. Which direction do you want the planks to run? If you put up an OSB base, you can run them whichever direction you like. I suppose you could run them diagonal, but be advised, bamboo is tricky to cut if not with the grain. A high-speed, fine-toothed blade in a miter saw helps. For cutting around can lights and openings, use painters tape to prevent splintering (actually the bamboo fibers tear free and ruin the surface like pulling a thread from a sweater). A fine-tooth jigsaw will do the trick. For semi-circular cuts, approach from each direction and meet in the middle.

After you’ve picked the direction to run your planks, consider the room width. Classic floor layout rules apply here. You don’t want 3 full sections and a 2” piece. Better to have 2 full sections and split the difference out of 2 remaining sections. The “scraps” could be used to lead off the next row to stagger your joints. Ultimately, it’s an aesthetic decision to avoid a “zipper” look. Keep in mind the short edges of the planks are also tongue and groove so plan accordingly. It’s important to do this up front so you’ll also know how much scrap you’ll end up with. Knowing this in advance means you won’t need to run out mid-project for additional bamboo that may not be from the same lot.

Squareness:
Consider where you’ll start with your first row. Measure all 4 wall lengths up at the ceiling to see if one is longer than another. Use a framing square to determine a square corner for reference. Ultimately, I found my room width was consistent, but that one of the long walls was ¾” longer than the other over 24’. I determined that 3 of my corners were square so I knew where the ¾ gap was going to end up. BUT, in my case it made more sense to pivot the entire assembly out from the long wall starting corner by 3/8 and split the difference. Like the old adage- better straight than level.

Reference Line:
After you’ve got your pattern decided and figured out your squareness and starting point, it’s time to snap a starting chalk line. Getting the first couple rows of flooring in perfectly straight is important. It’s tough enough to do on a floor, but this time you’re fighting gravity, too. I did something a little different. My plank width was 4” including the tongues. I snapped my chalkline from 0” at one corner to 3/8” off the wall at the other corner, then I measured 4” out from this line and screwed my 6’ level to it. Now I could apply adhesive to the bamboo planks, stick them to the ceiling, and pull them tight against my level (checking to see that the groove edge of the planks were in line with the chalkline). After the glue set, I unscrewed the level and moved it down for the remaining pieces of the first row (since my row was longer than 6’). A long, straight 1x4 or 1x6 would do nicely for long distances. NOTE: If you attempt to brad nail this row through its tongue shortly after gluing the pieces up, they will shift. Avoid the temptation. If you brad nail through the face, you’ll probably splinter the planks. Apply firm pressure to each piece for 10-20sec and let setup for an hour or two. You might also be tempted to pull the level and continue with the install, but everything will shift if you try to pin the second row without letting the first setup, so just wait.

Continuing On:
With the first row set, pull down the level (or board) and proceed.

I like to put a couple brads through the tongue of each piece after tapping them home with a scrap of bamboo and my framing hammer. Make sure the first row doesn’t shift when tapping the second row home. Even pinned boards will move if the glue hasn’t cured. As you accumulate more rows, the combination of total glued surface area and multiple brads will make it much easier to tap the next plank home without fear of shifting. When choosing brad locations, look for the low spots along the plank when fitted to the previous row. If one joist is higher than the others and the OSB creates a gap at that point, then don’t pin your plank there or your bamboo will follow the curve of the ceiling instead of laying flat.

I left an 1/8” gap along the long walls for expansion. As you select your next piece of bamboo, look for surface imperfections and bowing. Reject any that will cause you grief. Also take a look at lot-to-lot color. Intermix pieces from different lots whenever possible or you’ll end up with obvious striations.

Do yourself a favor and set up a card table or other work surface ahead of time. I found it easier to keep a pile of pre-cut lengths in one pile, light full length planks in another, and dark full length planks in a 3rd stack. To save time, it’s easier to choose the next several pieces, lay them face down on the table, apply your adhesive (1/4 beads) and then stage them where they can be easily reached to avoid multiple trips up and down the ladder. Better yet, have a second person doing the selecting and applying the glue while you do the install (or vice versa). And if you decide to take a break, be sure to wipe excess glue from above the tongue of the last installed row to prevent interference when you resume your install.

Keeping it True:
As you proceed, continue to check for flatness. Like a brick mason keeping each course level, over long runs you may have to adjust the fit of individual planks to maintain straightness of each row as tolerances stack up. Most of the rules for installing bamboo on the floor hold true, but beware that most bamboo trim isn’t real bamboo at all, but rather MDF strips covered with bamboo decals. In my application, this wouldn’t do, so I went with oak and found a complimenting stain. If this makes a difference to you, check it out beforehand.

And that’s it!  Good Luck!

A shot of one of the areas now featuring bamboo. Sorry for the narrow field of view; stepping back any further resulted in the ceiling being 'out of plane'..like taking a picture of the wall to get the ceiling. Yeah, I like low ceilings.











Wednesday, April 3, 2013

Spring


Seems like forever since I’ve posted, but things have been busy here the last month or so. I’ve made a big push to get all things interior-related with CS3 finished up before 1 April. This has meant evening construction practically every day, even with my Snap routine. It’s also meant a hard-core return to the To-Do list which, without, had days slipping by without progress. If you can track it and cross it off, you push to get it done.

So we’re 3 days into April.  There’s 4 of 8 front windows left to stain and the trim (already stained) is ready to go up around them. There’s a door to paint, but it has to be warm out because the thing has to be open to get painted. Some WIDE trim to cover the interior balcony edge (what’s it going to be?) And the false beam to finish (the prework blocking is now done). However, I’ve been equally busy on the exterior so I’m still on even ground. The soffits are completely finished. The soffit can lights are in and wired up and the trims are painted. The remaining roof “foam” job is done. The Remcraft floodlight unit is in. I’ve got 24’ of front over hang insulated (24’ more to go). And the profile for the front steel fascia has been submitted to Menards to be bent.

Anyhow, there’s lots of non-CS3 things that will need my attention this weekend if the weather holds. The Lodge clerestories and triangle windows all need cleaning (while I’ve got the picker), and the triangles will need their yearly seal inspection. The cement deck will need a hose-down and seal. The wood side deck needs a powerwash and a repaint. The cone lights need removal and painting (they’re aluminum and have their original paint). The ‘birds beak’ needs final trimout (now that I have a brake). Plus the roof and fascia inspection. Foundation painting. Metal railing painting. And more, I’m sure.

Plus it’s that time of year to take the plastic down from the kitchen/laundry area and do a big spring cleaning. Knock out the cobwebs, vac and scrub the floors, get the place ready for another season. Yeah, we may not be out of the woods yet with the overnight temps, but I’ve had enough.

Wednesday, March 13, 2013

Ruminations


I don’t know what it is, but frankly I’m in a bad mood. I think I’ve had it with this winter. We were spoiled last year, but spring seems so far off. It’s also not easy living at the Lodge, or living in the country, for that matter. Every little thing is amplified compared to city life. 

A coworker’s idea of “rough out there” is walking from their car to the front door of work, and then back at the end of the day. My idea of “rough out there” is every time I go from the bedroom to the kitchen through the unheated space between, that’s typically in the high 20’s or low 30’s depending on outside temps. We keep coats at both ends. If you leave your water bottle at the bottom of the steps, it will freeze. The kitchen is kept at 40F to prevent water lines from freezing, the upstairs unheated until we get home. Then there’s the matter of lack of a garage, and if there was a garage, how about an electric opener? And then the matter of getting to the road. You walk half a mile into straight-line wintry mix, or fight your way down the lane, over the tracks, and through the snow drifts in 4-wheel drive hoping you don’t get stuck because Lord have mercy this thing won’t have warmed up ‘til you’ve gotten to work and your boots are back at the Lodge and the drifts are several feet high and oh let’s just forget it and go back to bed.

I am not complaining about the situation. I could sell it all and move into an apartment in town with a heated garage, save 10’s of thousands of dollars, untold hours, and live like everyone else. No, I am complaining about winter. I know people that live in 1800’s farm houses out in the country, car outside, secondary roads that see little plowing. We deal with it.

On that happy note, It’s mid-March. Here’s a rundown for the archives-

Parents arrived home last week from their snow-bird Florida living. I decided to take them, Cara, and my grandma out to eat at Texas Roadhouse where a fine-time was had by all. Of note, the owners could open a second Texas Roadhouse directly next to this one and pack it just as easily on a Friday night.

The parents also picked up their new car, a 2013 GMC Acadia, which my dad bought and ordered through Deery last month while he was still in Florida. Very nice.

And in that vein, the 1993 Chevy Blazer is starting to get a little rough around the edges. The exhaust is a little louder. The engine runs a little rougher under load. The trans might be slipping a bit more after several incidents of freeing it from various snowy tombs this winter. And worst of all..the radio stops after several minutes of playing. Volume dependent, of course. The louder you have it, the less play time you get. It makes for an interesting ride to/from work…you turn it up just loud enough to figure out the song, then take it down a couple notches. Then you decide if you want to listen to the radio more than be warm, and adjust the fan speed accordingly so you can lower the volume.

The new Menards is slated to open next week and frankly, I’m thrilled. The only reason I end up at Crossroads these days is for materials. Not a fun drive, and not cheap to drive over there, either. Now, being directly on the way home, I won’t have to accumulate a week’s laundry list before sacrificing construction time and making the trek. It’ll also be easier on new shrubs and trees since the interstate can be avoided. 

The "Proposal 4" plan for the University corridor was released recently and I'm at a loss for words. Roundabouts or not, nobody should have to lose their home because The City thinks they know best how to improve traffic. The plans have roads, trails and right-of-ways grabbing land from wide swaths of the corridor and for all the wrong reasons. If the impetus for this project is to improve traffic flow, then that's one thing. Reducing the lanes to 4 and replacing stoplights with circles will keep the same throughput, IF people can figure out how to use them. If not, I think I'd rather wait my turn at a stoplight then have grandma pull out in front of me because she thinks I have to yield to her. If it's to integrate pedestrian/bicycling traffic to make the corridor more relevant, that's something else. If it's the former, this could be accomplished with better signaling and re-pavement with something other than blacktop. If it's the latter, they need a better plan than putting pedestrians in the line of fire around the perimeter of a round-about. Underpasses for cycles should be considered as a minimum. The entire corridor is becoming less and less relevant anyhow and a shot in the arm from foot traffic is not going to change that. In fact, it might hamper development.  /End of Rant.

Time for a CS3 Update…. We are coming along nicely on the interior. This winter saw a flurry of activity right before the cold really set in. Got the LP trenched in, the furnace and ducting installed, the ceiling drywall put up and all walls mudded and taped. Next was the carpet, and the painting. Floor tiles in the kitchen along with the appliances from the Big Move. I finished up the bamboo ceilings in both the entry and the living room, and this month, have tackled most of the interior window and door trim and staining, built the light fixture for the foyer, mudded and taped the downstairs entry walls, and have been doing the electrical in preparation for trenching in the service entrance. The goal is to get the interior stuff finished by 1April and if I continue to knock out tasks every night, I should be on target. Looming activities include finding an acceptable kitchen countertop pattern and making the countertops, deciding on a floor covering for the upstairs entry, putting in railings for the foyer, trimming out the walls, and deciding how far to take the upstairs bathroom for the interim. To frame or not to frame.

What else is new? I broke down and ordered the Philips Hue LED bulbs for the foyer pendants. I think they’ll be a lot more fun once we have that newfangled Internet out there. Also, I’ve been spending some bucks on eb*y buying what 16mm films I can afford, mostly shorts. I’ll need some editing/winding equipment, too. Eventually this will all be part of the Drive-In project but I fear funds might limit how far that gets this year (assuming I can get over the siding hurdle of CS3). There’s new garage doors for the Lodge, a serious look at grading and improving the lane, a carport/standalone garage project, plus other things of import like an antenna tower, a replacement for the Blazer, a trailer of some sort, good old property taxes, and the rest. Bah.





Friday, February 15, 2013

Fast Feb


And so it came to be that I found myself on my hands and knees, cleaning the oven, at noon on a Monday. And somehow in my mind, the light coming through the glass block windows had me convinced that it was 80F outside. It must be. Blue skies, green grass, a light breeze. Now, even with the best of imagination, this would be rather unconvincing to any Iowan that's spent the past 3 months cooped up inside waiting for the ice to melt... the secret is having been in such a paradise only a few short hours before. And your head asking why you aren't living there.

Our Resort at Port Orleans-French Quarter

We spent last week in Orlando at Walt Disney World taking in the magic of the place, and magic there is. We picked up our Sebring Convertible, sorry, 200 Convertible at the airport and within the hour I was set with gold rimmed aviators and a fedora. Something about the weather must bring out my inner octogenarian. Also, Cheesy Puffs for Cara; a regional specialty.

Following the iPad's directions we made our way to our resort at Port Orleans-French Quarter. Now, when I say Disney sweat's the details, they sweat the details. From the spanish moss in the trees to the rivet heads in all the New Orleans ironwork. After unloading our bags we dropped the car off at the Disney car-care center, jumped into an Alamo shuttle that took us directly to Hollywood Studios, and strolled over to the Sci-Fi Dine-In Theater for our 7:05 reservation with time to spare. Once again, it's the details that make fantasy reality. 

Hollywood Studios at Sunset

The Sci-Fi Dine-In, a drive-in theater...inside!

There's a lot of "retro" and new reissue stuff today. From countertops to table lamps. Let me tell you, Disney doesn't play that hackneyed game. I swear, they must design and fabricate damn near everything, from the cast iron building supports at our resort (in 1800's styles) to the wall tiles and wall paper in their restaurants. It's one thing to imagine a world and create it in animation, but it's something else to create it in the physical world when half of what you need doesn't exist at any cost.    

What's real? What's imaginary?

Oh, we had our days at the Magic Kingdom, Hollywood Studios, and Animal Kingdom, and even met up with my parents for a day at EPCOT. Words can't describe the places, or the food. We were on the Dining Plus plan which includes a table service meal, a quick service meal, and a snack for every day. Let me put it this way, a quick service meal would consist of something you might get down at Toad's. A big burger or sandwich, fries on the side, plus a dessert. A table service would be Brown Bottle territory. Except that when we ate at Tutto Italia in EPCOT, the food was prepared by an Italian chef and served by waiters that were actually from Italy as part of the Disney program. By the end of of the week we were leaving food on the plates, it was just too much! 

Quick Service at Ray's Cafe


Desserts at The Brown Derby

One of my favorite rides....Mission: Space and Twilight Zone Tower of Terror. The former utilizes a centrifuge with hydraulic-ram actuated pods that contain high def displays with a simulation of space. Once you climb in and buckle up (4 seats, 4 displays, 4 sets of controls to each pod), the controls and monitors tip towards you and you feel 2.5G's pull you back into the seat as you look out the "window" in front of you as if you were in the nosecone of an actual rocket leaving the pad. The forces and tilt match the video window as though you really left earth. It's quite an experience but leave many people feeling pretty sick. Because of that, a lesser version is also offered that keeps the tipping but does away with the g-forces.

EPCOT at Night

 


 The latter ride, with equally long lines, is based on the premise of a service elevator free-falling down a shaft in a haunted hotel. The elevator happens to seat something like 36 people, and actually does drop approximately 13 stories. In fact, you fall faster than gravity because the motors actually accelerate you downward. A computer program ensures the drops and lifts are random and occasionally 'elevator doors' open up to the outside while you're 100' up. Needless to say, it's got good seat belts. You'd be on the ceiling otherwise.

And so, running out of enthusiasm to share every minute detail, I'll let the following pictures do the talking....

Carousel of Progress- One of Walt's Original Attractions
Inside the Carousel of Progress
A Sneezing Lunch-Bird

A Hippo, Ducks, and one of many Herons

We Meet Tigger for Breakfast!

IBM Celebrates their 100th Anniversary

Cara checks out her car at GM's Test Track

We fight the crowds during extended hours..

A friend joins us for lunch..

Giraffes...Cool.
The Magic Kingdom at Night
Back to Reality