So here we are, mid-July already. I figure an entry is due, at least as a way to capture the progress and events of the last few months should I ever look back at 2016 and wonder what happened.
On the solar front...Apr was set aside for planning the system, revising the system, shopping components around, contacting the necessary authorities for approval and ordering parts. May was the buffer for the parts and components to arrive from all corners of the globe (and of course multiple freight deliveries), while the galvanized pipe was sourced locally. I also took care of the digging and cement work during this time. June was slated as the build month, for trenching, framework, panel bolt-down, excavation into CS3, etc. And I'm happy to report we were ready to flip the switch as of 1 July, with just one little hangup. Inspection. However, this process went smoothly after a date was pinned down and as of 14 July, the initial pass was given, CFU installed their net meter, and we went online that afternoon. Initial response is favorable- we are in fact generating more power than we're using, though without the ethernet link connected (hopefully be end of the week) I can only compare values off the inverter display and the registers on the net meter. It's an interesting paradigm shift (to use a phrase I'd rather not use). During the day we generate power at a higher return per kWh than we use.. And at night, we buy kWh's from the PoCo at the standard reduced rate. So when it's a cloudy day and production is down, the initial instinct is to conserve, but I'd argue that's probably the best time to consume as you're not offsetting those more valuable solar kWh's your selling back. One day I might get around to putting together a web page to capture the entire build; I made sure to snap photos and keep a log of the process and part numbers as others have done as no two builds are ever alike.
Earlier this month was the annual trip up north. This year was similar to last year's in that obviously the destination (Leech Lake) was the same, but also that both grandmas tagged along. On what is normally one of the busiest travel days of the year by car, I chose to avoid the whole 35/94 beaten path and headed west at Albert Lea, taking 13 to (state) 14 to 15 which merges with 10 at St. Cloud. With no congestion, accidents or construction, I'm convinced this was a faster route. And it allowed us to have a nice sit down lunch at McCormick's Family Restaurant, to pick up some tasty bacon and summer sausage at Knaus' Sausage House, and spend a few minutes at the Motley antique, uh, shop. Plus it was a beautiful day to cruise the two-lanes.
Once up north things unfolded predictably, except my desire to play Canasta. Years ago I'd play this up on 3rd Crow Wing and it didn't take much doing for us to get back into the grove of things after a quick consult with Wiki on the scoring rules. But for some reason this game managed to bring out the bickering and loathing of half the players when we'd all sit down for a 6-handed round. I have no idea why. Dominoes was a much safer choice and became the default when it was obvious things were going sideways.
This is likely the first year we didn't get to see the fireworks. Had pizza at Rocky's but the rain moved in fast and after sitting for an hour with clouds moving in the first droplets starting, we packed up and headed for the car before it became a frenzy of dashing tourists flailing coolers and folding chairs in the dark. As it turned out, they went on with the show 45 minutes after the fact (according to the radio), but I can only imagine sitting in all that rain and lightning just a few feet from a sizable body of water. I think we made the right call. Too bad the drive back to the parents was another hour.
We have our rock! Well, a quarter of it at least..I'd estimate about 50 ton. I got Mid Am to lay rock on the final stretch of lane where the biggest wash outs occur after the final turn. Actually, the rock extends up past that turn as we originally did have gravel there which was bladed under during their construction this winter. Nice to have that corrected, and the order for the rest of the out of pocket aggregate should arrive this Friday, weather permitting. Still have some grading to do as well as laying more of the geotextile fabric.
The Farmall is in intensive care due to a PTO bearing "failure". This little issue has turned into a project after pulley failure the week prior, prompting the purchase of a hydraulic press, which'll come in handy for lots of other uses. New seal, bearing and gaskets are on order. I just hope all goes well and soon! We'll get by with the push mowers and the rotary cutter if necessary, but that grass is starting to take off.
The CRP project is underway and we have completed the first mowing of the 47 acres. This is to cut the weeds down so sunlight can reach the prairie grass seedlings. It was roughly a 2-week task of getting in a few hours here and there whenever weather would allow, and burning weekends to stay ahead of the growth. Though it's really a never-ending battle and it looks like we'll have to go for round 2 here in just a couple weeks.
With respect to the Annex, the siding and paint work are officially complete. Soffits are next, though I'm not entirely sure if that's in the cards this year. I've got the materials, but it's a major time sink and there's enough other projects happening that it can wait. They say you'll never be bored living in the country, and that's true to a fault. I have finally managed to slug my way through sorting and stacking all the wood we cut from the highline project. I forget now, 3 or 4 pickup truck loads full up to the Lodge. Initially I laid a pair of treated 6x6's over landscape cloth as a makeshift drying base and stacked the logs on that. When that filled up, I added an 8' pallet and went three rows deep with logs (took another afternoon). When that reached capacity, I dragged over a 4x4 pallet (yesterday) and managed to get the last logs off the ground. Those rotting, not easily stacked or partials then got hauled to the burn pile. At least there's no longer a big pile of cut-up wood killing the grass and inviting snake habitation.
And to top things off, we got to see Huey Lewis and the News play right here in town to a venue of 1500 just two days ago. There's nothing more surreal than spending your afternoon sweating in the sun stuggling with a galvanized fence...a few hours later, raiding the refrigerator, and in between, seeing Huey Lewis perform. Foremost, they put on one hell of a show and somehow, 30 odd years later, sounded just as good as if I were spinning Sports. I have no idea how these guys manage to put on a show almost every night of the week; check their schedule, I'm not exaggerating. Frankly, I couldn't say enough good things about the performance, but the venue was a little too formal (typical CF haughtiness), and the dynamic of the crowd, a bit odd due to a mix of college kids not entirely familiar with the repertoire, older folks, like the man next to me, who I'm not entirely convinced had heard of HL before, and those in between who were rocking out to Power of Love.
(note: Originally photos were going to be added to this post, but it's 98F in the room I'm sitting in, and if I don't post the text now, it'll never happen).
Thursday, July 21, 2016
Wednesday, April 13, 2016
Spring has Sprung
It’s been a while since I’ve written…partly lack of desire, and
partly due to concerns of modesty or privacy. It’s hard to give personal updates
that involve the positive progress in one’s life without it coming off as a
humble-brag, but rest-assured, I don’t like to dwell on negativity nor air
dirty laundry, so that’s why you don’t see that here. I have no problem mentioning
challenges and obstacles in this blog, but when I do, it’s because I’m thinking
about ways to resolve them. If you want bad news, just turn to your favorite
mainstream media outlet.
So some good news- Spring has finally arrived. No April
showers yet, but the grass is greening up and the temps are warming. That means
spring maintenance like taking down the snow fences around the trees, trimming
branches, putting away the snow shovels and ice chipper. And a return to
fair-weather transportation.
The to-do list is growing and I didn’t accomplish all I
wanted to last year on my “break” summer. Still one wall of siding to complete
on the Annex, soffits remaining and painting to tackle. I think the secret here
is to hit it hard while spring-fever gives me enough drive to do so. And before
the heat, bugs and humidity make it unbearable. The picker batts are charged
and I have this Friday off so we’ll see how the painting goes on the north
side.
There’s also some new construction projects this year,
including adding lean-tos to each side of the existing tractor-shed (of course
that means geo-textile fabric and gravel $$). I’m also moving full-steam ahead
on the 10kW grid-tie solar project. I’ve spec’d out a system and put together a
proposal. This week I met with CFU to share my details and was met with a “fine,
whatever” response. I was provided a form for Parallel Generation of Power to
be completed and submitted, but am waiting on questions regarding credits to
make sure this project is worthwhile. Unfortunately, Iowa is not as progressive
as other states when it comes to alternative energy, and this utility offers
ZERO rebates for installing such a system. If the answers come back favorably,
I’ll be pushing this forward hard to take advantage of the summer peak-power
producing months. The next obstacle will then be pulling a permit and working
with the district inspector for approval.
This is the first year we’ll be ‘farming our own’ and have
pulled the land off of cash rent. Seeding is already taking place around us but
we’re at the mercy of MidAm to get their equipment and dirt piles cleaned up
before that can start (within the next 10 days). This’ll be an interesting experiment
as well as it requires a lot more work than just depositing a check once a
year, but it does mean no more heavy equipment cross-traffic on our lane. On
the upside, with MidAm out of the picture, and potentially the neighbor using
his own new-found property, we might just get a real road put in this year.
Plan 2020 is still in effect. We added a camper to the lineup
this winter for future endeavors but my engineering side has put together a
list of improvements and upgrades that will actually be fun and provide instant
gratification (as opposed to multi-year gratification which ain’t so hot). I
also brought home a ’66 Toro from MN with Ben’s help…something to tackle later
on, after construction projects are wrapped up and the Bluegill Pontoon is
restored. And after I figure out what to do with this Touring Sedan. Actually, if
it were in better interior shape than I thought it was in, this wouldn’t be a
problem. I suppose I could clean it up..after all, the paint and body is
excellent, and after some mechanical work it should run like a new car. Hell, with
a little elbow grease it’s essentially free transportation.
Tuesday, January 12, 2016
A Mid-Summer's Check-In Part 2 aka The Second Half of the Year in Review
It
wasn't too long before an opportunity in Michigan presented itself. A complete
Cad 390 engine and Hydra-matic transmission from a 1959 Cadillac were put up
for sale. The pickup was empty and the price was right. Don offered up his
place for an overnight stay and Ben and I hit the road for a quick turnaround.
We made it back by Sunday afternoon though missed out by minutes on a
Radarange. We may also have worn out a few cassettes….
Next
thing you know, the Cadillac-LaSalle Grand National was staring me in the face.
Betwixt the construction projects and travel, I was also working on the '59 CdV
that's been off the road since '09. Brakes were completely dry and still on a
single MC. The rebuilt engine was untested. The fuel system needed an overhaul
including a new fuel tank, hoses and fuel sending unit, and the exhaust
remained loud as hell despite throwing money at it back in '05. The leather was
dry, the interior panels were once again discolored and the mice had made a
real mess. But by the end of July, the car was ready, and we set out for
Milwaukee with Ben and his '61 for the show. It was the perfect 'shot in the
arm' needed to get the car ready and roadworthy and we had a great time
traversing the countryside and taking in the other beautiful cars despite the
rainy departure. I think we may have even made a few friends there.
With
barely time for a breath, Cara, myself, and both grandmas, loaded into Grandma
K’s Deville and set-sail for Walker, MN for a week of relaxation. This was the
first 4th of July trip since my grandma sold her place so it was a little
different game plan, but I'll save that for another entry. Let it be said,
there was some Cracker Barrel on the way! The fireworks did not disappoint and
Cara and I got in a little canoeing. We even came right upon a bald eagle
perched on a branch enjoying a fish he had just caught. Our presence didn’t
seem to faze him.
The
'59 Pontiac became the daily-driver after putting exactly 1000 miles on it last
fall. Mileage is probably triple that by now this year. The only issue has been
a faulty fuel pump (new last year) causing a knock and occasional starvation
issue. Easy fix once I figured it out.
For
a brief while, we had a functioning 1957 dishwasher, after adding casters,
replacing hoses, and sprucing things up a bit by adding a lighted dial.
Unfortunately, it was not to be as the pump seal started leaking thereafter, so
this one goes back on the list for repair. A GE combo machine was added to the
collection and after a few hours work, is now in service. This was my first
transaction with Uship and getting the machine from California to Iowa was
interesting with delays, excuses, and break-downs, but it made it intact.
![]() |
| Summer Chores |
Almost
every week there was something new in July…from getting tipped off about a CRP
program and getting the ball rolling with the local FSA office, to finishing
the rock and drainage at the pole building. I even finally pulled the trigger
on a much-needed tractor at the local dealership which handled mowing duty,
lane maintenance and snow removal this December. Plus hauling and transporting
rock and other heavy things around the place (like toting a THM325 from the
Lodge to the pole building in its bucket).
![]() |
| Taking a break to enjoy a weekend bonfire |
By
this point we were bearing down on August, and a welcome invite from some
washer friends had us loading up the Sky and heading to Minnetonka, MN for the
weekend. The weather was perfect as we enjoyed drinks on the lake, cruising
away the afternoon. Just recalling it from the distance of this snowy January
morning is enough to give me a little inspiration to get the Blue Gill
restored. The trip was memorable for another reason as well….we almost died. A
4x8 sheet of plywood broke off of a semi we were about to pass and hit us
square on, but since we were so low to the ground we were fortunate that it
only skimmed us. Any other vehicle and the force would probably have tripped
the airbags while we were doing close to 70MPH. This also meant that I had to
deal with the transport company’s insurance and have the repairs made on the
car.
But
August was busy for other reasons, too. My failed attempts at trying to finish
the Lodge EIFS had culminated with me tracking down Fernando. He took on the
job but it was slow going, finally wrapping up almost a month later. Meanwhile
I focused on the Annex siding. Finished the front, the rear and 95% of the
west, though only the rear received paint treatment. My bigger focus was
finishing CS3 and between rocking the foyer, installing pavers and milling
cedar for the rear siding (which I painted a 2nd coat earlier in the
spring) I’d say is just about there. I also discovered MMM and the potential of
early retirement that month which I’ve written about prior.
![]() |
| Trimming out the doors after EIFS completion |
During
this time Cara and I were also busy sending out invites and securing Black Hawk
Park for our wedding celebration (29Aug). The party was a major success even
with torrential downpours the days prior.
September
kind of snuck up on us. I found a little breathing room to get things ready
before Geoff dropped in from Australia and spent a couple weeks. We paid the
Kiwi a visit to exchange a teletype for a homebrew computer that was once a
Mohawk Data Systems Key-to-tape unit and took in some super computers in an
Iowa barn as well as a Delorean, but more importantly, toured the Iowa
countryside in the Suburban on a sunny, but chilly, day, and had a memorable
meal at the Dirty Dog.
![]() |
| The '59 Catalina and '61 DeVille ventured to Montour, IA. |
The
month marched on, I continued with my evening RR panel repairs for folks and
struck up a deal with a seller on the east coast who had an actual RR-1. A
friend is holding it until I can get out there in 2016; while I don’t want to
count my eggs before they’re hatched, this would be a real centerpiece in the
collection. Meanwhile, more dealing was taking place on setting up the CRP
paperwork for next year. Cutting out costs and getting my insurance up to date,
and deciding to sell off the Sky. I could either have that money working for me
generating interest, or working against me as depreciation in a used car. Time
to get serious!
Now
it was getting cold and the prospect of snow was on the way. With the potential
for MidAm to come in this winter and work in our field, I decided a gate and
fence would be cheap insurance not only from trespassers, but also from damage
to my personal portion of the lane from their heavy equipment. I cut up some of
the old drive-in 6x6 timbers and Cara and I installed them along with a 12’
gate down near the tracks. It took a few weeks (not a lot of evening light in
December) but I eventually got the barbwire fence put in along with the timber
N-frames at each end. A come-along put the needed several-hundred pounds of
tension on the barbed wire so I could get it tacked in place and supported. An
educational project for sure.
I
had wanted to get CS3 online in the fall, but eventually decided the only way
to get the project moving forward was to skip connecting to water at that time
(digging down to the well and installing an underground valve and drainage
would have been a major undertaking). I can run an alternate path to the east
side of the building at a later date, and the savings of trying to combine both
in the same trench is minimal in the long run. After lining up the trencher, I
got cold feet and decided to ‘play it by the book’ with the service entrance.
It worked out as we spent all day trenching from the new gate to CS3, then CS3
to the Annex for power. We got a little snow a week later and the electrical
inspector got back to me and gave the go-ahead for the service entrance. While
not exactly a ‘fun’ time, cables were buried for power to the meter and for
communication into the lodge.
We
wrapped up the year with solar power up at the road, an automatic gate opener
controlled from the Lodge, and full time power into CS3.
Tuesday, November 24, 2015
The Solar Garage Door Opener
Well, not really. More like the 12V DC powered opener. I’m
sure they exist, and they probably cost an arm and a leg. But let’s see what we
can do with a more conventional model; both for cost and for parts. The idea is
to use a 12V deep cycle battery charged by a 100w panel with charge controller
to run a garage door at a remote building. The primary use for the power is for
lights inside and out, but if a suitable door opener can be added, why not?
I used a 12v inverter and a pair of aligator leads to jumpstart the unit. After leaving it powered for 30 seconds, I simply disconnected the clips, put my wire nuts on the DC leads and coiled up the AC cord. Disconnect too early and it won't go into DC mode. If one really wanted a belt-and-suspender approach, one of those cheapie 150w self contained inverters could be mounted inside the opener case (plenty of room) and a toggle switch added to the exterior. The AC cord could be removed and rewired internally to the inverter. No futzing necessary.
Also of note, this unit learns remote controls dynamically. You press the Learn button on the unit, then hold in the wireless remote button until the unit flashes its lights. Well guess what...on DC it won't flash its lights (obviously). It won't even click its relay....but it will still pair with your remote. Simply hold down your remote button for 30 sec and then see if it works. If it didn't learn it, try again but hold it down longer. Eventually it'll get through all the codes and have picked the transmitter up. And there you have it- A custom 12V opener with remotes and minimal power consumption for the price of a discount standard model.
(Update 12/23: It's one month later and the unit works perfectly. No resets, no outages, no issues.)
After some googling, I found several commonly available
openers (Sears/Craftsman, Champion to name a couple) that possessed a battery
backup feature. Checked the batt specs and they were indeed 12v. Their
description seemed to match what I was looking for (door operation with the
loss of 120VAC up to a dozen or so times). But such ‘fancy’ openers also have
lots of unneeded features. Would they work at all on DC? Would they be totally
useless for the life of the opener? Let’s find out.
After shopping around I picked up a new, surplus ¾ HPS Belt
Drive Craftsman model off that popular internet auction site. Model 9-54918
(139.3043). It came with a pair of remotes, a wireless outdoor keypad, the
required electric eyes and a switch panel that included control of the lights
and door plus backlit LCD display with program buttons. Hmm.
Right off the batt…let’s tear this thing apart and see what
we’re working with. Well, the switch panel with all the fancy features, like
motion detection and display of interior temperature, connects with only two
wires, so there’s a communication protocol taking place, and it’s safe to
assume microprocessors at each end. Indeed, the rear of the opener contains a circuit
board with micro, relays, driver transistors, etc. And you know what else that
means? Software.
| Standy Curent Measurement |
The drive motor itself is the type used in automotive window
regulators and to cycle windshield wipers and is pretty easy to drive. +12v on
the red lead and -12V on the other will drive it one direction; reverse
polarity to go the other way. So, if you want a brute force drive method and
have no need for wireless control, cut those leads, run them out and there you
go. However, you now have no safety features nor remote operation. There’s
probably a better way…and there appears to be.
First, the thing is too smart for its own good. Buttons and
indicators on the rear allow for setting the upper and lower limits of the door
and for entering a learning mode to communicate with remotes. When first
connected to AC, a rapid flashing green led indicates battery charging. This
will turn orange when fully charged. The unit also communicates by flashing the
120VAC bulbs to tell you what else is going on, such as a wiring or
communication error with the photoeyes, or restoration of AC power. I would
like to rewire one of the two lights for 12VDC operation, and seeing as a basic
SPDT relay on the PCB turns these on and off, some hacking should be easy, but
it’s not. Software detects the absence of AC power and prevents engagement of
this relay except when the motor is energized, so no time delay. And while the
wall control has a Light pushbutton and the remotes can be programmed to use
their other buttons for remote lighting, that’s a no-go on DC only. At least
the 120VAC convenience sockets are wired with spade terminals, so a little
rewiring allows the second bulb to be pulled out of circuit and wired to DC as
we see fit. A 555 timer triggered off the relay coil (that only energizes
during motor movement) should do the trick.
| D24 is in the center of the relay footprint. Sharpie + and - marks denote coil pins that will trigger external time-delay circuit. |
The photo eyes must be wired and installed, and I believe
they also have serial communication to the opener. The good news is a visible
LED is mounted on each to see when they’re connected and when they’re drawing
power. There’s no tell-tale click of a relay when the eyes are blocked, so
bypassing to conserve power is not an option. However, there’s some good news.
After 5 successful door open/close cycles (aka learning mode) once power is
connected, the eyes power down when the door is closed. This cuts standby
current in half (0.130A drops to 0.055A in standby). That’s less than 1 watt in
the quiescent state.
If you think you’ll just bypass the transformer and inject
your DC there, that could work, but be aware the system voltage is in the
low-20’s VDC so it’ll take more than a 12V battery to make it work. I have to
assume the way the software is written that you’ll also draw more standby power
going this route, as it will think it’s connected to AC.
When on DC-only several other things happen. The backlight
is shut off on the wall control and the LCD lets you know you’re off the grid.
The light button is disabled as well as temperature and motion sensing. Luckily
the door button still works. The wireless remotes still work, too. A “Time to Close” feature that automatically
closes the door x-minutes after opening is disabled. Big deal.
While I haven’t buttoned the unit up and installed it yet,
one glaring issue is that if DC power is removed while not plugged into an AC
outlet (such as swapping your battery) the unit will not power-up again without
momentarily seeing AC. And you can’t just leave the onboard battery in parallel
with the external deep cycle source as it’s small enough to be damaged/overheat
and lead to bad things. Since this should be a rare occurrence, it might be
possible to wake it up with a little AC inverter plugged into my cigarette
lighter should the need arise. Current would be minimal, we’re just
jump-starting the micro.
Update: The unit has been installed and works! I used 14 awg NM romex for the 12V power and I suppose voltage drop could be improved with 12 awg or larger, but honestly these openers were never designed to be "speedy" on DC; their aim was to get the job done. At less than 20' from the battery, this doesn't appear to be an issue.
Update: The unit has been installed and works! I used 14 awg NM romex for the 12V power and I suppose voltage drop could be improved with 12 awg or larger, but honestly these openers were never designed to be "speedy" on DC; their aim was to get the job done. At less than 20' from the battery, this doesn't appear to be an issue.
I used a 12v inverter and a pair of aligator leads to jumpstart the unit. After leaving it powered for 30 seconds, I simply disconnected the clips, put my wire nuts on the DC leads and coiled up the AC cord. Disconnect too early and it won't go into DC mode. If one really wanted a belt-and-suspender approach, one of those cheapie 150w self contained inverters could be mounted inside the opener case (plenty of room) and a toggle switch added to the exterior. The AC cord could be removed and rewired internally to the inverter. No futzing necessary.
Also of note, this unit learns remote controls dynamically. You press the Learn button on the unit, then hold in the wireless remote button until the unit flashes its lights. Well guess what...on DC it won't flash its lights (obviously). It won't even click its relay....but it will still pair with your remote. Simply hold down your remote button for 30 sec and then see if it works. If it didn't learn it, try again but hold it down longer. Eventually it'll get through all the codes and have picked the transmitter up. And there you have it- A custom 12V opener with remotes and minimal power consumption for the price of a discount standard model.
(Update 12/23: It's one month later and the unit works perfectly. No resets, no outages, no issues.)
Monday, November 9, 2015
On November, Part 2.
One couldn’t ask for a better segue into this month. The days are sunny and temps hover in the 50’s; we’ve only started to nip on the heels of the overnight frosts, and there’s less than a week to go before we can cross off half the month. Soon enough this’ll all feel downright tropical…better make hay while the sun shines.
And make hay, we
did. Since this year was one of a maintenance-mode (no major construction), it’s
meant I’ve gotten a little soft in crossing off the to-do items. Oh, I still
update the spreadsheet daily, and try to at least chip away at the projects
that are due, but there’s been no hard and fast schedule to dig a trench by a
certain date, nor play beat the clock with the weatherman over getting a roof
on the place. Since I rely on setting goals and crossing them off the list so I
can sleep well at night, lately this has posed a problem. If I were one of
those types that took serious satisfaction in my corporate office job, this
wouldn’t be an issue, but I have a hard time equating 8 hrs in front of a
computer with the same mental planning and physical effort of framing a wall.
That’s not to say one is inherently more virtuous than the other, it’s just
that lunch tastes better when you’ve worked up a sweat.
So this was a
welcome weekend where I was able to cross all the to-do’s off without
exception. Saturday morning I decided to defrost the Deepfreeze..first time it’s
needed doing since I brought it home and since it wasn’t 200F inside I figured
I had half a chance of knocking it out without the ice cream turning to mush. A
little heat gun action and a bucket to haul off the ice chunks and we were back
in biz. Love that pre-war Deepfreeze…. I also got it into my head to vacuum the
upstairs, grab the shopvac to get all the Asian beetles and boxelders swarming
the clerestories, then go after the bugs that so love the 18’ garage door
windows. Plus a good downstairs sweeping. What a difference! And let’s not talk
about the flies…
Sat PM I could start
on the work, and this involved cutting, edge priming, drilling and installing
more siding on the west side of the Annex. I’m really beginning to rue siding
work, especially with all the gyrations of fetching planks, crawling up ladders,
using the picker bucket, painting ends, etc. I managed to wrap it up by 5PM,
leaving a couple courses of siding left that will have to be cut to follow the
slope of the roof. This gave me time to clean up before Ben stopped by at 5:30
for a trip to the OP in Waverly. Note: Good food, extremely busy, too damn
bright. But it was a nice night and despite each of us only eating half our
orders, I think we still required rolling to the car.
It seems I have a
tough time on weekends these days. I wake up far too early, still tired, but
not wanting to go back to sleep. The sun is up so I screw around on my phone
for a while, say enough is enough, then get up and get dressed. Sunday was no
different. So after a quick breakfast, I proceeded to juggle the chargers on
the picker batteries, got the compressor and charged it, then blew out the yard
hydrant lines. Next was man-handling the old 16’ gate, and the 18’+ long 6x6
timbers once used for the drive-in screen. The pickup handled them with ease,
along with the post hole digger and shovels. After a few trips to the tractor
shed for pea gravel, I was set. Cara came down to lend a hand and we installed
the cut down 6x6’s on each side of the driveway on the east side of the tracks.
A third 6x6 went in to form the slat reinforcement for the hinge side of the
gate. Prior to digging, I decided a smaller gate would better suit us, even if
we had to go buy one. The 16’ would be unwieldly in the snow and force the
posts too far apart…then there was the matter of weight. We ended up getting
everything placed and backfilled before 12:30, though I still need to pick up a
12’ gate to hang.
Next was the
unenviable chore of sealing the front cement deck on the lodge. This is a
yearly chore to help keep ice from damaging the cement. Last weekend I replaced
all the butyl rubber in the expansion joints as part of this two-pronged
attack. The trick is to roll out the sealer without allowing any of it to run
or drip off the cement edges, yet all top surfaces have to be coated. It went
fairly well this year.
Finally, a vintage
light fixture was installed at the pole building up at the road. This is in
preparation for a 100w solar photovoltaic system I’m planning on putting in
this month. Just a simple, single panel arrangement with charge controller and
deep cycle batt. Depending how the install goes, I might expand the system with
a modified overhead door opener so Cara can get in and out with her car this
winter without the “fun” of a manual door in sub-zero temps.
However the big news
will be next weekend…the current plan is to rent a trencher and put it to work.
500’ feet will need to be trenched for some Cat-5e cable to run to a telephone
down at the gate (as well as future connection for a camera, low-v lighting,
etc). Then underground 12-3 cable from CS3 to the Annex. Then a trench from CS3
over to the Pump House to finally get CS3 on the grid. Dropped into the same
trench in ¾” poly pipe will be network and coax cables tying CS3 to the Lodge.
Cable and other items have been ordered and are enroute but the biggest
obstacle is the planning. There are already enough underground cables and pipes
that we’ll have to tread carefully in some areas, which means lots of hand
digging.